We are now turning our attention to preparing the interior of the original foundation for installation of the hydropower system. This has involved removal of heavy items from the foundation, discovery and removal of the old cast iron turbine and removal of the concrete side of the tailrace where the water exits the turbine and building. The heavy lifting is being done by Rockport Steel.
|
Author
This blog follows the process of rehabilitating the mill and restoring hydropower to the dam at Freedom Falls in Freedom Maine.
Archives
January 2023
Categories |