Things inside are beginning to take shape, with framing and rough-ins well underway.
On New Years' eve Owen discovered two millstones buried under off the northeast corner of the building as he was digging a trench for the Town fire hydrant and our electrical conduit. The two stones appear to be a pair, one bed stone and one running stone, both with metal bands. Once the frozen dirt and ice are removed, we will be able to learn more about their construction and use.